S.V.E.N Inc.™

“If there is no struggle, there is no progress.” — Frederick Douglass

Precision Demolition & Clean-Up, L.L.C.

Services & Pricing Guide

Reference document for demolition, cleanup, debris removal, and related field services. All work is scoped and confirmed by written estimate before scheduling.

Licensed, bonded, and insured in Washington. WA LIC# PRECIDC74504.

Scope Limits & Pricing Notes

  • Full-day, half-day, and flat-rate pricing may be available depending on job scope.
  • Disposal and dump fees are separate when applicable.
  • Hazardous or contaminated materials may require a surcharge or exclusion.
  • Regulated abatements are not included unless separately qualified and contracted.
  • Estimates depend on access, material type, volume, disposal needs, and timeline.
  • Reference ranges below are not binding quotes — final pricing is confirmed on estimate.

Pricing Reference Categories

Category Minimum Typical range
Yard waste cleanup $250 $350 – $900
Fence removal $400 $600 – $1,800
Tree limb / branch removal $350 $500 – $1,500
Fallen tree removal $500 $700 – $2,000
Bush / shrub removal $300 $450 – $1,200
Light stump removal $350 $500 – $1,500
Junk / estate cleanout $400 $600 – $2,000
Construction site cleanup $400 $600 – $1,800
Rental turnover cleanup $350 $500 – $1,500
General labor support $350 half-day / $600 full-day $600 – $1,200/day depending on scope

Important Scope Limits

  • Structural engineering, heavy civil, and large-scale commercial demolition are outside standard scope.
  • Asbestos, lead, mold abatement, and regulated hazardous-material handling require separate qualification and contract.
  • Contaminated or unknown materials may be declined or priced with surcharge after review.
  • Concrete removal is limited to work within agreed job scope — not standalone heavy breaking without assessment.
  • Light commercial only — no overclaiming specialty trade or industrial demolition capacity.

Pricing Adjustments

  • Access difficulty — tight entries, stairs, long carries, or limited staging may adjust labor time.
  • Material weight / volume — concrete, dense debris, or high-volume loads affect labor and disposal.
  • Disposal fees — dump, recycling, and transfer-station costs billed separately when applicable.
  • Timeline / urgency — rush scheduling may affect availability and pricing.
  • Site conditions — weather, occupancy, utilities, and safety constraints reviewed at estimate.

Client / GC Use Note

General contractors and project managers may use this guide for budgeting reference only. Send scope, photos, access details, and schedule requirements for a job-specific estimate. Phased work, turnover cleanup, and selective demolition are scoped to your timeline and site conditions — not as open-ended labor without a defined outcome.

Disclaimer

This guide is for reference and planning purposes only. It does not constitute a binding quote, contract, or guarantee of availability, pricing, or outcome. All services require a written estimate and mutual agreement before work begins. Precision Demolition & Clean-Up, L.L.C. reserves the right to decline work outside licensed scope, safety parameters, or operational capacity. Disposal costs, surcharges, and scope changes will be communicated before additional work proceeds.